Scheduling rules with PROMODEL
There are currently too many topics in this group that display first. To make this topic appear first, remove this option from another topic.
There was an error processing your request. Please try again.
flag
  1 message - Collapse all
The group you are posting to is a Usenet group. Messages posted to this group will make your email address visible to anyone on the Internet.
Your reply message has not been sent.
Your post was successful
mussa  
View profile
 More options Jun 26, 10:01 am
Newsgroups: sci.engr.manufacturing
From: mussa <mgw...@uccmail.co.tz>
Date: Thu, 26 Jun 2008 07:01:46 -0700 (PDT)
Local: Thurs, Jun 26 2008 10:01 am
Subject: Scheduling rules with PROMODEL
Dear,

I am a PhD student

I need a help on modelling a manufacturing system with a PROMODEL
simulator basing on the following scheduling rules: first in first out
(FIFO), last in first out (LIFO), shortest processing time (SPT),
longest processing time (LPT), and earliest due date (EDD).

5 part types (A=800 parts, B=350 parts, C=700 parts, D=450 parts, and
E=750 parts) have to be processed in a flexible manufacturing system
(FMS) that comprise 4 CNC machines (machine 1, machine 2, machine 3,
and machine 4). The parts should be processed simultaneously in the
FMS. The total processing times consumed at the machines for the
number of parts given above together with the part flow are given as
follows:

Part Type A: machine 4 (239 minutes) --> machine 1 (34 minutes) -->
machine 2 (242 minutes)

Part Type B: machine 4 (20 minutes) --> machine 1 (9 minutes) -->
machine 3 (281 minutes)

Part Type C: machine 1 (156 minutes) --> machine 3 (136 minutes) -->
machine 4 (44 minutes)

Part Type D: machine 4 (14 minutes) --> machine 1 (87 minutes)

Part Type E: machine 1 (131 minutes) --> machine 2 (175 minutes)

It is required to determine the makespan (completion time) with the
above scheduling rules so that they can be compared.

Waiting for your help and thanking you in advance.

--
Mussa I. Mgwatu
Department of Design and Production Engineering
University of Dar es Salaam
P.O. Box 35131
Dar es Salaam, TANZANIA

E-mail: mgw...@uccmail.co.tz


    Reply to author    Forward  
You must Sign in before you can post messages.
To post a message you must first join this group.
Please update your nickname on the subscription settings page before posting.
You do not have the permission required to post.
End of messages
« Back to Discussions « Newer topic     Older topic »

Create a group - Google Groups - Google Home - Terms of Service - Privacy Policy
©2008 Google